This project forms stage 2 of 3 of the Warrambah Creek Fencing to protect Riparian areas and Gamarren subdivision. 13k of Electric fence with steel posts, 5 plain & 1 barbed wire, insulators, energizer & solar power will be constructed to allow for rotational grazing as outlined in our property plan. Subdivisional fencing to divide 2 paddocks currently 5499ha into 4 paddocks - North Mulligans 1943ha, South Mulligans 1020ha,Red Hill 883ha, & Adams 1616 ha with 8k poly pipe, 2 tanks & 2 troughs .
Landtypes in each paddock are as follows;
Adams 1616ha with Warrambah Ck - Wooded Alluvial,
Red Hill 883ha - Mulga Sandplain with Hop Bush & False Sandalwood
North Mulligans 1943ha – Soft mulga & claypan swamps and lakes
South Mulligans 1020ha - Soft Mulga & Claypan ,Swamps & Lakes.
Funds provided by South West NRM Ltd towards this project total $10,000.00